Water circulates again at Veigas de Ponteliñares (ACTION B3)

Water circulates again at Veigas de Ponteliñares (ACTION B3)

The Limia river is reaching normal levels for this winter season, after the drought that had been living in the river basin. This means that the water begins to circulate normally in the meander recovered with the Life Project REGENERA LIMIA at Veigas de Ponteliñares, an area defined as ACTION B3.

Water analytical controls are still carried out to check the reduction effect of organic pollutants dissolved in the water. It is expected to appreciate a decrease in its concentration, given that the vegetation that inhabits the meander and revegetated with the project will begin to perform its purification work.

You can consult the hydrological and water quality data of the Limia River in real time in the Ponteliñares Station, through the Automatic Hydrological Information and Water Quality System SAIH-SAICA, at the following address: http://saih.chminosil.es/index.php?url=/datos/mapas/mapa:H1/area:HID/acc:

7-_Salida_del_Meandro_al_rio_Limia_  6-Final_del_meandro_inundado 

2-Entrada_del_meandro_inundada  3-Interior_del_meandro_con_circulacion_de_agua_ 

4-Estado_actual_del_interior_del_meandro  1-Entrada_al_MeandroRio_Limia